-40%
Used 110V Industrial Water Chiller for CNC/ Laser Engraver CW-3000
$ 72.86
- Description
- Size Guide
Description
USEDIndustrial Water Chiller For CNC/Laser Engraver
(No return No refund )
The main function of is water cycle,if you want refrigeration and cooling,we recommend #
130002
CW-3000 Series is professional cooling machine referring to international,advanced thermolysis cooling system design, suitable for small water-cooled cooling devices requested machinery.
1. Specific disconnection alarm security protection.
2. Hermetic type water tank, water is available for a long time used.
3. Real-time temperature monitoring, accurate knowledge of heating devices working condition.
4. Professional air-cooled forced radiator with strong heat dissipating capacity and difficult to be blocked up.
5. Equipped with alarm output port to protect sensitive components quickly.
6. High cost performance, low failure rate.
#1.POWER SW
#2.TEMPERATURE DISPLAY #3.RUNNING INDICATOR
#4.SYSTEM ALARM INDICATOR #5.WATER SUPPLY INLET
#6.INLET
#7.OUTLET
#8.ALARM SIGNAL OUTPUT TERMINAL #9.POWER SOCKET (WITH FUSE��
#10.RADIATOR FAN
#11.MACHINE PARAMETERS
#12.SERIAL NO.
#13.WATER DRAIN
SPECIFICATIONS
MODEL
CW-3000DG
Voltage
AC100-120V
Frequence
50/60HZ
Current
0.9A
Cooling
50W/��
Capacity
9L
Inlet and outlet hold
Outside dimensions 10mm brass connector
Max .Lift
10M
Max.Flow
10L/min
Protection
Flow alarm
N.W
9.5Kg
G.W
12Kg
Dimensions
47*27*37cm (L*W*H)
Packing
dimensions
59*39*48cm (L*W*H)
CAUTION
1. It is strictly forbidden to plug and run the cooler without feeding water.
2. Cooler should be placed in a well-ventilated, dry environment place and away from heat sources. Please keep at least 30cm from obstructions to the air outlet which is in the back of the cooler, and should leave at least 10cm between obstructions and air inlets of two sides. 3. The cooling water must be drained if the cooler is out of use for long time or before being transported.
4. To protect laser tubes , the radiator fan of cooler will suspend to work when water temperature is lower (about 10��) , and it will restart to run when water temperature rises to higher (about 20��).
The first Installation It is very simple to install this industrial cooling machine. The first time installation of the new machine can be carried out by following steps.
1. Open the package to check if the machine is intact and all the necessary accessories are completed.
2. Open the injection port, then add cooling water.
3. According to system conditions, connect the water inlet and outlet pipe well.
4. Plug in power, turn on the power switch. (Do not allow the water overflow)
5. Check the water level of the water tank again. (It should be 80-150cm from the surface of water to the injection port)
Maintenance
1. To ensure good heat dissipating, please open the lid to clean the dirt after the cooler used in long-term.
2. Working in cold north area, it is better to use noncorrosive antifreeze fluid.
On Dec 12, 2022 at 23:36:03 PST, seller added the following information: